wiki: passage-confirmation design and stage-73ada89 deploy notes (2026-10-24)
Wiki pages written on 2026-10-24 but left uncommitted before the Windows to Linux migration: passage-confirmation concept, open question 20, deploy and query log entries, index line, incident and barrier page updates. Drops the stray tracked __pycache__ file. Line endings normalised to LF. Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
This commit is contained in:
@@ -0,0 +1,116 @@
|
||||
---
|
||||
type: concept
|
||||
tags: [parking, vision, barrier, lane, ledger, safety, design]
|
||||
sources: []
|
||||
updated: 2026-10-24
|
||||
status: open
|
||||
---
|
||||
|
||||
# Passage confirmation — did the car actually cross? (design, 2026-10-24)
|
||||
|
||||
**Problem (user, 2026-10-24).** A motion push opens the barrier and signs the entry/exit. If the
|
||||
driver changes their mind and reverses out, the ledger holds a false entry, and — because the
|
||||
barrier operator at the sites closes **only when its sensor/radar is tripped by a passage** — the
|
||||
boom stays up until the next car trips it. That next car enters with no ticket, no read, no ledger
|
||||
row. So an abandoned entry is both a wrong row and a free pass. Related: the FIFO stale-occurrence
|
||||
problem seen on AB694XU the same day (an exit closes the oldest open occurrence; one double read
|
||||
leaves a subscriber permanently one stay behind).
|
||||
|
||||
**Constraint (user).** The cameras are the cheap Hikvision DS-2CD1043G2-LIU: motion push with a
|
||||
vehicle target, a sub-stream, and no line-crossing / smart events. The booth PC does the thinking.
|
||||
Cameras are sensors; compute is ours. The Dahua bench unit has tripwire (`CrossLineDetection`) but
|
||||
that is not the fleet camera.
|
||||
|
||||
## Design
|
||||
|
||||
1. **Frames: the RTSP sub-stream, not ISAPI stills.** Keep one RTSP session open per camera
|
||||
permanently (avoids the keyframe start-up gap of 1–2 s; set the sub-stream I-frame interval to
|
||||
≤ 1 s). Decode in the vision service (OpenCV 4.13 with FFmpeg is already in the container; no
|
||||
`ffmpeg` binary needed). The still-pull loop in `anpr-entry.ts` is replaced by this — it also
|
||||
removes the single-threaded picture-endpoint collisions (503s).
|
||||
*Latency (user asked 2026-10-24):* RTSP itself adds nothing meaningful; the delay is the
|
||||
camera's encoder (~100–300 ms) plus whatever the decoder buffers. Open the stream with a
|
||||
minimal buffer (`CAP_PROP_BUFFERSIZE 1`, TCP transport, drop to the newest frame), and the
|
||||
watcher sees a frame well under half a second after the event. The 1–2 s start-up gap is a
|
||||
keyframe wait, which is why the session stays open. To be measured on park-lab against the
|
||||
motion-push timestamp once a camera is on the bench.
|
||||
2. **Trigger and window.** Nothing runs while the lane is empty. A motion push starts a *watch* on
|
||||
that camera; it holds while pushes keep arriving (1–3 s apart while a car moves — see
|
||||
[[lane-presence-and-anpr-entry]]) and ends a few seconds after they stop, or at a hard cap.
|
||||
3. **Detection + tracking.** The existing YOLOX vehicle detector gives a box per car; a small
|
||||
in-house tracker matches boxes between frames by overlap and follows each track's
|
||||
**bottom-centre point** (ground contact; stable under perspective). No tracker library.
|
||||
4. **The segment.** Drawn once per camera in Setup over a live frame; stored as two normalised
|
||||
points + which side is A, in the same normalised frame the plate/vehicle boxes already use.
|
||||
Crossing = sign change of the cross product of the tracked point against the segment. A→B on
|
||||
the entry camera is a passage; the exit camera has its own line. A→B→A inside the window is a
|
||||
reversal (not a passage). The verdict carries the track's plate if ANPR read one on it.
|
||||
5. **One watcher, two consumers.** The same decoded frames feed the ANPR bridge (subscriber
|
||||
auto-open) and the crossing tracker (confirmation).
|
||||
6. **Lane state becomes positive.** Busy while any track is between the line and the boom; free
|
||||
when the last track crossed or left the frame; the 30 s TTL stays only as a fallback when the
|
||||
stream is down. `vehicle_passed` ⇒ lane free *unless another track is present* (tailgating).
|
||||
This is the software form of the pass-through sensor [[entry-double-press]] asked for.
|
||||
|
||||
### Ledger semantics (append-only, unchanged open path)
|
||||
|
||||
- `vehicle_entry` / `vehicle_exit` remain **intent**: the barrier was commanded open. The open is
|
||||
never delayed by confirmation.
|
||||
- `vehicle_passed` (new, signed): the crossing was seen, with how (vision track) and the plate.
|
||||
- `entry.abandoned` / `exit.abandoned` (new, signed): window ended with no crossing. Closes the
|
||||
occurrence; a printed ticket is **invalidated** so the paper cannot be handed to the next car.
|
||||
- *unverified*: vision/stream unavailable — recorded as such; the stay counts (benefit of doubt).
|
||||
Occupancy and the active list count passed + unverified; abandoned are listed as what they are.
|
||||
A subscriber's stay only exists once the car is seen to cross — which also kills the stale
|
||||
FIFO occurrence at its root.
|
||||
|
||||
### Closing the boom after an abandonment — evidence-driven, never timed
|
||||
|
||||
[[barrier-not-a-door]] stays: no timed close. A close may be **expressed** (a pulse on a spare
|
||||
Dingtian channel into the operator's *close* input) only when **all** hold: an abandoned verdict;
|
||||
the tracker reports nothing between the line and the boom and nothing approaching, for a few
|
||||
seconds; no new open since; the watch is alive (stream up, verdict fresh); and the close is itself
|
||||
a signed event with the last frame attached. Vision down ⇒ no close, ever (today's behaviour).
|
||||
The operator's safety devices (loop / photocell) must be verified to override a close command
|
||||
on the real unit before this ships. Requires a revision (not repeal) of the standing decision,
|
||||
with the test results attached.
|
||||
|
||||
## Test plan — on park-lab (user, 2026-10-24: "we will test it on park-lab")
|
||||
|
||||
1. Confirm the operator's close input; wire a spare relay to it.
|
||||
2. Close with a car on the safety loop → boom must not move / must reverse.
|
||||
3. Close with the photocell beam broken by a person → same.
|
||||
4. Reversal: open, back out, window expires → close pulses, boom comes down.
|
||||
5. Tailgate: second car approaching while the first backs out → the tracker holds the close.
|
||||
6. Vision service stopped: reversal again → boom stays up, event logged unverified.
|
||||
|
||||
## Measured on park-lab (2026-10-24, i5-9500, vision container, CPU only)
|
||||
|
||||
YOLOX-S ONNX, input fixed at 640 by the exported graph (smaller inputs need a re-export):
|
||||
|
||||
| intra-op threads | ms / frame (p50) | ≈ fps on that budget |
|
||||
| --- | --- | --- |
|
||||
| 2 (service default) | 132 | 7.5 |
|
||||
| 4 | 79 | 12.5 |
|
||||
| 6 | 66–70 | 14 |
|
||||
|
||||
Decode of a 704×576 sub-stream frame is < 1 ms (MPEG-4 part 2 proxy; H.264/H.265 will be a few
|
||||
ms) — negligible next to inference. So one lane at 5–6 fps costs ~0.7–0.8 of two cores during a
|
||||
watch and nothing between watches; two lanes at once need 4 threads or detection on alternate
|
||||
frames with the tracker interpolating. Cheaper still: re-export YOLOX at 416 (~2.4× fewer FLOPs)
|
||||
or switch to YOLOX-Tiny/Nano for the tracker (the plate stage keeps its own detector).
|
||||
|
||||
**Still needed to measure the stream path:** a camera on the bench. The lab Dahua (10.0.10.11) was
|
||||
off on 2026-10-24; the office Hikvisions on the same net (10.0.10.122/.125/.126/.128) need
|
||||
credentials. Nothing of park-lab's device registry has a camera yet (only the relay emulator).
|
||||
|
||||
## Open questions
|
||||
|
||||
- Re-export YOLOX at 416 vs YOLOX-Tiny for the tracker — accuracy on far cars at the line?
|
||||
- Window cap and "lane clear" dwell before a close (start: cap 60 s, dwell 3 s).
|
||||
- Does the DS-2CD1043G2-LIU keep pushing VMD for a car *reversing*? (It should — motion is motion.)
|
||||
- Stream-to-event latency and frame drop rate on the booth PC (measure, don't assume).
|
||||
- Which barrier operator model is at the sites, and does park-lab have one for steps 1–6?
|
||||
|
||||
Related: [[lane-presence-and-anpr-entry]], [[barrier-not-a-door]], [[entry-double-press]],
|
||||
[[append-only-event-chain]], [[opencv-anpr-service]], [[park-2-event-loop-stall]].
|
||||
Reference in New Issue
Block a user