1f63a7063c
New decision page booth-users-and-permissions: identity has its home in the platform and the booth is in constant two-way sync, local login from the copy, product keys auth and parking, 37 proposed keys with all 44 of today's permissions mapped, two jobs, the rules, key-pair signing, what the platform needs, and what is left to the sync design. Hub page event-driven-refactor: the decisions of 2026-11-23 on users and permissions, validation and car wash out of the booth (postponed), and the language (TypeScript with Docker; Rust abandoned). Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01RZgP5oZdzvo92Eouc9eRv5