Files
directus/.gitea
julian 0f89fea913 Task 1.8 — Gitea CI dry-run workflow
.gitea/workflows/build.yml builds the directus image on path-filtered
pushes to main and validates the boot pipeline against a throwaway
Postgres before pushing the image to the registry. The dry-run is the
gate that catches snapshot drift, broken db-init scripts, or
incompatible schema changes before they reach stage.

Workflow shape (mirrors processor's CI but tailored to Directus):
- Path filter: snapshots/, db-init/, extensions/, scripts/,
  entrypoint.sh, Dockerfile, the workflow file itself.
  Docs-only commits (.planning/, README.md, compose.dev.yaml,
  package.json) do NOT trigger CI.
- Throwaway Postgres via services: block, pinned to the same
  timescale/timescaledb-ha:pg16.6-ts2.17.2-all tag as compose.dev.yaml.
- Plain `docker build` (NOT build-push-action) so the image stays in
  the local daemon for the subsequent docker run dry-run.
- Dry-run: --network host + --entrypoint bash to override the upstream
  entrypoint and run only apply-db-init.sh && schema-apply.sh.
  Skips bootstrap and pm2-runtime — the schema apply is the gate.
- Two image tags: :main (mutable) and :<sha> (immutable).
- Optional Portainer webhook gated on secret presence; curl -fsS so a
  misconfigured URL fails the step explicitly.

Spec corrections folded in (the spec's draft had two contradictions
that would have failed at runtime):
1. DB_HOST=localhost (not 'postgres'). With --network host, service
   containers are reachable on the runner's loopback by their port
   mapping, NOT by service name. Service-name resolution requires the
   default bridge network; --network host overrides it.
2. health-retries 20 (not 10). timescaledb-ha:*-all does more init
   work at boot than vanilla postgres; 50s isn't always enough.

Operator action required in the Gitea repo Settings before first run:
configure REGISTRY_USERNAME and REGISTRY_PASSWORD secrets (required for
push); optionally PORTAINER_WEBHOOK_URL (for auto-deploy).

Live verification deferred to first relevant commit. Documented in the
task spec's Done section: positive (clean snapshot → push succeeds)
and negative (malformed snapshot → halt before push) cases to validate
once CI runs.

ROADMAP marks 1.8 done. Phase 1 progress: 8/9 tasks complete (1.1–1.8);
only 1.9 (Rally Albania 2026 dogfood seed) remains before Phase 1 ships.
2026-05-02 10:04:39 +02:00
..