Add slim Phase 1 task 1.11 (Dockerfile + Gitea workflow) for pilot deploy
- Multi-stage Dockerfile (Node 22 alpine, BuildKit cache, non-root user). HEALTHCHECK and metrics port (9090) deferred until task 1.10 ships; comments document the resume. - .gitea/workflows/build.yml — single build job following the pattern of other TRM repos (no services/container, ubuntu-latest direct). Tests + typecheck + lint inline; image tagged :main. - compose.dev.yaml — local-build variant for verifying Dockerfile changes pre-push. Production deploy lives in the sibling deploy/ repo. - .env.example documenting all runtime env vars. - README updated to point at deploy/ for production and explain CI. - Task 1.11 marked done (slim variant) in ROADMAP and task file.
This commit is contained in:
@@ -58,7 +58,7 @@ These rules govern every task. Any deviation must be discussed and documented as
|
||||
| 1.8 | [Redis Streams publisher & main wiring](./phase-1-telemetry/08-redis-publisher.md) | 🟩 | `af06973` |
|
||||
| 1.9 | [Fixture suite & testing strategy](./phase-1-telemetry/09-fixture-suite.md) | 🟩 | `381287b` |
|
||||
| 1.10 | [Observability (Prometheus metrics)](./phase-1-telemetry/10-observability.md) | ⏸ | *deferred — see below* |
|
||||
| 1.11 | [Dockerfile & Gitea workflow](./phase-1-telemetry/11-dockerfile-and-ci.md) | ⬜ | *next, in slim form for the pilot* |
|
||||
| 1.11 | [Dockerfile & Gitea workflow](./phase-1-telemetry/11-dockerfile-and-ci.md) | 🟩 | `<SHA>` (slim pilot variant) |
|
||||
| 1.12 | [Production hardening](./phase-1-telemetry/12-production-hardening.md) | ⏸ | *deferred — see below* |
|
||||
| 1.13 | [Device authority (Redis allow-list refresher)](./phase-1-telemetry/13-device-authority.md) | ⏸ | *deferred — see below* |
|
||||
|
||||
|
||||
Reference in New Issue
Block a user