6 Commits

Author SHA1 Message Date
julian d0e8503e13 Fill in task 1.10 commit SHA in ROADMAP 2026-04-30 20:54:57 +02:00
julian d4a6d8f713 Implement Phase 1 task 1.10 (Prometheus metrics + /healthz + /readyz)
Replaces the placeholder Metrics shim with a prom-client implementation
in src/observability/metrics.ts: all 10 Phase 1 metrics from the wiki
spec, plus nodejs_* defaults. Exposes /metrics, /healthz, /readyz over
node:http on METRICS_PORT (9090); /readyz returns 503 when Redis status
is not 'ready' or the TCP listener isn't bound.

The Metrics interface in src/core/types.ts is unchanged — adapter call
sites continue to use the same inc/observe shape. Only main.ts sees the
extended type that adds serializeMetrics().

Side effects:
- Dockerfile re-enables HEALTHCHECK pointing at /readyz, and EXPOSE 9090.
- frame-ingested log downgraded back to debug now that
  teltonika_records_published_total is scrapeable.
- 19 new unit tests covering exposition format, all metric types, and
  every HTTP endpoint path. Total now 98 passing.

Note: deploy/compose.yaml still does not expose 9090 — separate decision
about how Prometheus reaches the service (host port vs. internal scraper
on the same Docker network).
2026-04-30 20:54:32 +02:00
julian 33c3fa0c8e Fill in task 1.11 commit SHA in ROADMAP 2026-04-30 17:31:52 +02:00
julian dda53bec16 Add slim Phase 1 task 1.11 (Dockerfile + Gitea workflow) for pilot deploy
- Multi-stage Dockerfile (Node 22 alpine, BuildKit cache, non-root user).
  HEALTHCHECK and metrics port (9090) deferred until task 1.10 ships;
  comments document the resume.
- .gitea/workflows/build.yml — single build job following the pattern
  of other TRM repos (no services/container, ubuntu-latest direct).
  Tests + typecheck + lint inline; image tagged :main.
- compose.dev.yaml — local-build variant for verifying Dockerfile
  changes pre-push. Production deploy lives in the sibling deploy/ repo.
- .env.example documenting all runtime env vars.
- README updated to point at deploy/ for production and explain CI.
- Task 1.11 marked done (slim variant) in ROADMAP and task file.
2026-04-30 17:31:25 +02:00
julian 90d6a73a60 Sync ROADMAP statuses with landed work; mark 1.10/1.12/1.13 as paused
Tasks 1.1-1.9 marked done with their landing commit SHAs. Tasks 1.10
(observability), 1.12 (production hardening), and 1.13 (device
authority) marked paused with explicit resume triggers — pilot
deployment on real Teltonika hardware takes priority. Task 1.11
remains as next, in slimmed form for the pilot (no /readyz healthcheck
since the metrics endpoint is part of paused 1.10).
2026-04-30 16:49:07 +02:00
julian c8a5f4cd68 Add Phase 1 and Phase 2 planning documents
ROADMAP plus granular task files per phase. Phase 1 (12 tasks + 1.13
device authority) covers Codec 8/8E/16 telemetry ingestion; Phase 2
(6 tasks) covers Codec 12/14 outbound commands; Phase 3 enumerates
deferred items.
2026-04-30 15:50:49 +02:00