- entities/zkteco-cmp200-barrier: terminal map from the CMP200 manuals, board photo findings (v1.2 layout, RS485 socket empty), relay-contact drive from the Dingtian, interlocked close relay, limit outputs as status inputs - concepts/passage-confirmation: barrier model open question answered for the unit on hand - decisions/appliance-provisioning: Komodo gotchas 14-16 from the park-lab reinstall (2026-11-13) - index and log entries Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01RZgP5ofaSqgLGHMGSL3xYN
7.6 KiB
type, tags, sources, updated, status
| type | tags | sources | updated | status | |||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| concept |
|
2026-10-24 | open |
Passage confirmation — did the car actually cross? (design, 2026-10-24)
Problem (user, 2026-10-24). A motion push opens the barrier and signs the entry/exit. If the driver changes their mind and reverses out, the ledger holds a false entry, and — because the barrier operator at the sites closes only when its sensor/radar is tripped by a passage — the boom stays up until the next car trips it. That next car enters with no ticket, no read, no ledger row. So an abandoned entry is both a wrong row and a free pass. Related: the FIFO stale-occurrence problem seen on AB694XU the same day (an exit closes the oldest open occurrence; one double read leaves a subscriber permanently one stay behind).
Constraint (user). The cameras are the cheap Hikvision DS-2CD1043G2-LIU: motion push with a
vehicle target, a sub-stream, and no line-crossing / smart events. The booth PC does the thinking.
Cameras are sensors; compute is ours. The Dahua bench unit has tripwire (CrossLineDetection) but
that is not the fleet camera.
Design
- Frames: the RTSP sub-stream, not ISAPI stills. Keep one RTSP session open per camera
permanently (avoids the keyframe start-up gap of 1–2 s; set the sub-stream I-frame interval to
≤ 1 s). Decode in the vision service (OpenCV 4.13 with FFmpeg is already in the container; no
ffmpegbinary needed). The still-pull loop inanpr-entry.tsis replaced by this — it also removes the single-threaded picture-endpoint collisions (503s). Latency (user asked 2026-10-24): RTSP itself adds nothing meaningful; the delay is the camera's encoder (~100–300 ms) plus whatever the decoder buffers. Open the stream with a minimal buffer (CAP_PROP_BUFFERSIZE 1, TCP transport, drop to the newest frame), and the watcher sees a frame well under half a second after the event. The 1–2 s start-up gap is a keyframe wait, which is why the session stays open. To be measured on park-lab against the motion-push timestamp once a camera is on the bench. - Trigger and window. Nothing runs while the lane is empty. A motion push starts a watch on that camera; it holds while pushes keep arriving (1–3 s apart while a car moves — see lane-presence-and-anpr-entry) and ends a few seconds after they stop, or at a hard cap.
- Detection + tracking. The existing YOLOX vehicle detector gives a box per car; a small in-house tracker matches boxes between frames by overlap and follows each track's bottom-centre point (ground contact; stable under perspective). No tracker library.
- The segment. Drawn once per camera in Setup over a live frame; stored as two normalised points + which side is A, in the same normalised frame the plate/vehicle boxes already use. Crossing = sign change of the cross product of the tracked point against the segment. A→B on the entry camera is a passage; the exit camera has its own line. A→B→A inside the window is a reversal (not a passage). The verdict carries the track's plate if ANPR read one on it.
- One watcher, two consumers. The same decoded frames feed the ANPR bridge (subscriber auto-open) and the crossing tracker (confirmation).
- Lane state becomes positive. Busy while any track is between the line and the boom; free
when the last track crossed or left the frame; the 30 s TTL stays only as a fallback when the
stream is down.
vehicle_passed⇒ lane free unless another track is present (tailgating). This is the software form of the pass-through sensor entry-double-press asked for.
Ledger semantics (append-only, unchanged open path)
vehicle_entry/vehicle_exitremain intent: the barrier was commanded open. The open is never delayed by confirmation.vehicle_passed(new, signed): the crossing was seen, with how (vision track) and the plate.entry.abandoned/exit.abandoned(new, signed): window ended with no crossing. Closes the occurrence; a printed ticket is invalidated so the paper cannot be handed to the next car.- unverified: vision/stream unavailable — recorded as such; the stay counts (benefit of doubt). Occupancy and the active list count passed + unverified; abandoned are listed as what they are. A subscriber's stay only exists once the car is seen to cross — which also kills the stale FIFO occurrence at its root.
Closing the boom after an abandonment — evidence-driven, never timed
barrier-not-a-door stays: no timed close. A close may be expressed (a pulse on a spare Dingtian channel into the operator's close input) only when all hold: an abandoned verdict; the tracker reports nothing between the line and the boom and nothing approaching, for a few seconds; no new open since; the watch is alive (stream up, verdict fresh); and the close is itself a signed event with the last frame attached. Vision down ⇒ no close, ever (today's behaviour). The operator's safety devices (loop / photocell) must be verified to override a close command on the real unit before this ships. Requires a revision (not repeal) of the standing decision, with the test results attached.
Test plan — on park-lab (user, 2026-10-24: "we will test it on park-lab")
- Confirm the operator's close input; wire a spare relay to it.
- Close with a car on the safety loop → boom must not move / must reverse.
- Close with the photocell beam broken by a person → same.
- Reversal: open, back out, window expires → close pulses, boom comes down.
- Tailgate: second car approaching while the first backs out → the tracker holds the close.
- Vision service stopped: reversal again → boom stays up, event logged unverified.
Measured on park-lab (2026-10-24, i5-9500, vision container, CPU only)
YOLOX-S ONNX, input fixed at 640 by the exported graph (smaller inputs need a re-export):
| intra-op threads | ms / frame (p50) | ≈ fps on that budget |
|---|---|---|
| 2 (service default) | 132 | 7.5 |
| 4 | 79 | 12.5 |
| 6 | 66–70 | 14 |
Decode of a 704×576 sub-stream frame is < 1 ms (MPEG-4 part 2 proxy; H.264/H.265 will be a few ms) — negligible next to inference. So one lane at 5–6 fps costs ~0.7–0.8 of two cores during a watch and nothing between watches; two lanes at once need 4 threads or detection on alternate frames with the tracker interpolating. Cheaper still: re-export YOLOX at 416 (~2.4× fewer FLOPs) or switch to YOLOX-Tiny/Nano for the tracker (the plate stage keeps its own detector).
Still needed to measure the stream path: a camera on the bench. The lab Dahua (10.0.10.11) was off on 2026-10-24; the office Hikvisions on the same net (10.0.10.122/.125/.126/.128) need credentials. Nothing of park-lab's device registry has a camera yet (only the relay emulator).
Open questions
- Re-export YOLOX at 416 vs YOLOX-Tiny for the tracker — accuracy on far cars at the line?
- Window cap and "lane clear" dwell before a close (start: cap 60 s, dwell 3 s).
- Does the DS-2CD1043G2-LIU keep pushing VMD for a car reversing? (It should — motion is motion.)
- Stream-to-event latency and frame drop rate on the booth PC (measure, don't assume).
- Which barrier operator model is at the sites? The unit on hand is a zkteco-cmp200-barrier:
its close input is
DOWN(dry contact toG), and the manual saysDET/PHOreverse a falling boom — steps 1–3 can be run on it.
Related: lane-presence-and-anpr-entry, barrier-not-a-door, entry-double-press, append-only-event-chain, opencv-anpr-service, park-2-event-loop-stall.